SMED (single minute of Exchange OF those, dt.: Tool change within the one-digit minute range) marks a procedure, which is to reduce the preparation time of a production machine. A goal is it, without disturbing the manufacturing river to reequip the machine on a new manufacturing process.
Was developed the procedure of Shigeo Shingo, which as external advisors considerably in the development Toyota of the production system (TPS) was involved.
Conversion: In several iterative steps the preparation time is improved by organizational measures. Larger investments become, if at all, only at a very late time transacted.
Substantial element during the conversion is it to divide preparation procedures into internal and external steps.
SMED runs off in four steps:
These steps are repeated gone through, until the preparation time lies in the one-digit minute range.
For optimization different techniques are used, e.g.:
Advancements of the SMED procedure are: