The load-oriented order release (BoA) fulfills a subfunction of the progressing. In contrast to the "classical" order release, the production planning is arranged into the indexing steps order selection and a release-testmeaningful condition for the BoA is a preceding capacity calculation. Their result, the altogether needed capacity for the manufacturing of the lining up orders, is the basis of the BoA.
Within the order selection an urgency examination is accomplished. This is done via a of all orders. (Retrograd) all urgently not classified orders are reset up to the next planning run.
The release examination goes through a load calculation as the first. For each capacity unit is examined whether the maximum load is exceeded. For it the so-called Belastungsschranke.Es only the orders for the workshop is decisive is released, which can be worked on within the load barrier.
A goal of the BoA is it to release only as much work as can be also processed in the next period. Thus workshop existence are to sink and increase the clarity. The turn-around times can be reduced by better clarity and smaller control expenditure within the workshop.
Walter Eversheim, shoe (Hrsg.): Enterprise of production systems. Springer Berlin, 1999, ISBN 3-540-65454-2